logo
Tel:
Tellhow Technology (Chongqing) Co., Ltd.
Tellhow Technology (Chongqing) Co., Ltd.

Motor kami, hemat energi Anda, dorong kesuksesan Anda!

Rumah Berita

What are the maintenance items for high-voltage motors

I 'm Online Chat Now
Sertifikasi
Cina Tellhow Technology (Chongqing) Co., Ltd. Sertifikasi
Cina Tellhow Technology (Chongqing) Co., Ltd. Sertifikasi
Ulasan pelanggan
Motor berjalan sempurna dengan kebisingan rendah, dan layanan panduan pemasangan jarak jauh video sangat baik. Pemimpin kami sangat puas.

—— Misha Gladushchenko

Pabrik sangat ketat dan serius tentang teknologi, dan dapat memberikan saran yang sangat ilmiah untuk menyesuaikan detail motor sesuai dengan lingkungan penggunaan kita. Ini adalah perusahaan yang sangat dapat diandalkan.

—— Nur Rizky Amalia

perusahaan Berita
What are the maintenance items for high-voltage motors
berita perusahaan terbaru tentang What are the maintenance items for high-voltage motors



I. Pre-Maintenance Preparation

  1. Safety Isolation & Power Shutdown

    • Disconnect and lock out the power supply (LOTO), verify voltage absence using a discharge rod, and ground the motor windings to prevent accidental energization.
    • Post warning signs and establish a restricted zone. Personnel must wear 10kV insulated gloves, boots, and goggles.
  2. Preliminary Fault Diagnosis

    • Visual Inspection: Check for cracks, burn marks, or excessive dust on the casing and ensure legible nameplate data.
    • Electrical Tests: Measure insulation resistance with a megohmmeter (e.g., 2500V for 6kV motors; minimum 1MΩ/kV). Record polarization index (≥2.0) and absorption ratio (≥1.3).
    • Mechanical Check: Rotate the rotor manually to detect bearing obstruction or abnormal noise.

II. Motor Disassembly

  1. External Component Removal

    • Label and disconnect power cables (e.g., U1, V1, W1), then short-circuit and ground them with copper wires.
    • Remove cooling fans, shrouds, and couplings, documenting the disassembly sequence.
  2. Bearing & End Shield Removal

    • Mark alignment between end shields and the frame before disassembly. Use pullers or copper mallets to avoid damaging bearings.
    • Inspect bearings for pitting, cracks, or excessive play (e.g., >0.2mm clearance requires replacement).
  3. Rotor Extraction

    • For large motors, use balanced hoisting tools to extract the rotor without contacting stator windings. Measure air gap uniformity (deviation ≤±5%).

III. Core Component Maintenance

  1. Stator Inspection

    • Winding Check: Identify grounding, short circuits, or breaks. Re-insulate damaged areas with Class F mica tape (10 layers) or rewind if necessary.
    • Core Repair: Tighten loose laminations with insulation wedges; perform core loss tests on overheated sections.
    • Slot Wedge Fixing: Secure loose wedges with epoxy resin to eliminate hollow sounds.
  2. Rotor Maintenance

    • Bar Repair: Weld broken rotor bars (copper/aluminum) using TIG welding or replace with copper bars.
    • Slip Ring/Commutator: Machine surfaces to roughness Ra≤1.25μm; adjust brush pressure to 15-25kPa.
  3. Lubrication & Cooling System

    • Clean bearing housings and repack with grease (e.g., lithium-based, ≤2/3 capacity). Clear blocked cooling ducts and replace damaged fan blades.

IV. Reassembly & Testing

  1. Reassembly Steps

    • Reverse the disassembly sequence. Heat bearings to 80–100°C for installation (avoid direct flame exposure).
    • Seal terminal boxes with dual-layer protection (rubber gasket + waterproof putty). Ground cable shields at one end.
  2. Electrical Tests

    • DC Withstand Test: Apply 2.5× rated voltage (e.g., 25kV for 10kV motors); leakage current deviation ≤50%.
    • No-Load Test: Run for 2 hours, monitoring current imbalance (≤5%), bearing temperature rise (≤55K), and vibration (≤2.8mm/s).
  3. Protection Device Calibration

    • Verify differential protection response time (≤35ms) and overcurrent tolerance (±5%).

V. Documentation & Maintenance Planning

  1. Data Archiving
    • Record insulation resistance, withstand voltage, and no-load current for trend analysis.
  2. Scheduled Maintenance
    • Minor Maintenance (6–12 months)​: Clean, tighten bolts, and replace lubricant.
    • Major Overhaul (5+ years)​: Full disassembly and winding replacement.

Critical Notes

  • Safety Compliance: High-voltage tests require a team; keep fire extinguishers ready.
  • Environmental Control: Maintain humidity ≤80% to prevent insulation damage.

This procedure should be adapted based on motor specifications. For OEM-specific guidance , consult manufacturer manuals.


Pub waktu : 2025-08-04 09:22:56 >> daftar berita
Rincian kontak
Tellhow Technology (Chongqing) Co., Ltd.

Kontak Person: Mr. Alex Yip

Tel: +86 2386551944

Mengirimkan permintaan Anda secara langsung kepada kami
Tellhow Technology (Chongqing) Co., Ltd.
Kamar 607-609, Gedung 3, Central Plaza, No.34, Jalan Xi Jiao. Chongqing. Cina
Tel:86-155-23661144
Situs Seluler Kebijakan pribadi | Cina Bagus kualitas Motor AC Tegangan Tinggi pemasok. © 2022 - 2025 Tellhow Technology (Chongqing) Co., Ltd.. All Rights Reserved.